← Back to CRA Insights
CRA and other EU law

The New Product Liability Directive Treats Software as a Product: What It Means Next to the CRA

Most CRA planning focuses on 11 September 2026 and 11 December 2027. A third date deserves a place on the same calendar: 9 December 2026, when the revised EU Product Liability Directive (Directive (EU) 2024/2853) starts to apply. It is a different kind of law from the CRA, but it points at the same thing: the security of software in the products you sell.

This is general guidance, not legal advice. National transposition is still under way and details vary by Member State, so speak to counsel and your insurer about your own position.

TL;DR

  • The Product Liability Directive (PLD) applies to products placed on the market or put into service from 9 December 2026, and Member States must transpose it by then (Dreyfus, 25 September 2026).
  • It expressly treats software as a product: operating systems, firmware, applications and AI systems, however supplied.
  • The CRA is product regulation enforced by authorities, with fines. The PLD is civil liability: people harmed by a defective product can claim compensation.
  • Cybersecurity requirements feature in the test for whether a product is defective. CRA compliance is not a safe harbour, and CRA non-compliance does not automatically equal a defect, but your CRA file is the best evidence you will have.

Two laws, two jobs

CRA (Regulation 2024/2847) PLD (Directive 2024/2853)
Purpose Set cybersecurity requirements for products with digital elements Compensate people harmed by defective products
Who acts Market surveillance authorities Claimants and courts
Key dates Reporting from 11 Sep 2026; full application 11 Dec 2027 Applies to products placed on the market from 9 Dec 2026
Consequence Administrative fines up to EUR 15M or 2.5% of worldwide turnover for the most serious breaches (Art. 64), plus corrective measures Damages for covered harm
Software Core scope Expressly included as a product

The PLD covers certain kinds of damage, such as death or personal injury, damage to property and loss or destruction of data not used for professional purposes. It is not a general remedy for every bug. Check the Directive text and national rules for the exact scope. See the Lexology overview and Gibson Dunn's analysis for more.

What makes software "defective"

A product is defective when it does not provide the safety the public is entitled to expect. The assessment looks at intended function, reasonably foreseeable use, interaction with other products and, notably, relevant cybersecurity requirements (Dreyfus). A cosmetic display glitch is a different matter from a remotely exploitable flaw in a connected lock.

That is where the CRA matters. Annex I of the CRA is a detailed statement of what cybersecurity a product should have. A court is free to look at it when deciding what the public may expect. See Security by Design Under the CRA.

Updates stay your problem

One feature matters particularly for software makers. Article 11 removes the "the defect appeared after release" defence for elements that remain under the manufacturer's control. That includes a defective software update or upgrade, and a failure to provide an update necessary to maintain safety. The Directive does not oblige you to ship every possible update, but the link to ongoing security maintenance is clear.

This lines up with the CRA's support period and free security updates. If you declare a support period, stick to it. See the CRA support period and when a dependency goes end-of-life.

Evidence is half the case

The PLD gives courts tools to order disclosure of relevant evidence (Article 9) and allows presumptions of defectiveness where a defendant fails to disclose what is required (Article 10). In plain terms: if you cannot show how a product was built, tested and maintained, a court may be allowed to assume the worst.

The CRA technical file is already the record that answers those questions. Items worth keeping, in a form you can produce:

  • The cybersecurity risk assessment (Article 13 risk assessment) and how it changed over time.
  • Version history, release approvals and test records, including security testing.
  • SBOMs for each release (SBOM starter).
  • Vulnerability handling records: reports received, decisions, fix dates and user notifications.
  • Update logs showing what was released to which versions, and when.
  • Support-period declarations and end-of-support notices.
  • Any Article 14 reports and the facts behind them.

Note the flip side: CRA reporting records and vulnerability logs may be disclosable in litigation. Write them factually and keep them accurate.

What to do before 9 December 2026

  1. Check the date logic. The PLD turns on when a product is placed on the market. Know which products and software releases fall after 9 December 2026.
  2. Align your records. Make sure the CRA technical file work you are already doing is kept in a retrievable, dated form.
  3. Review your update practice. Can you show timely fixes for known security issues in supported versions?
  4. Review contracts and insurance. Ask your insurer how software and cyber exposure is treated under the new regime, and review supplier contracts for component liability.
  5. Track transposition. National laws will shape procedure and detail.

What this does not mean

It does not mean the CRA replaces the PLD, or that meeting one satisfies the other. It does not mean every vulnerability creates liability. And it does not mean small manufacturers are exempt. The two laws pull in the same direction: design securely, maintain what you ship, and keep records.

Sources

Regulation (EU) 2024/2847, the Commission's CRA page, and the secondary analyses linked above. Check the text of Directive (EU) 2024/2853 on EUR-Lex for the operative wording.

See all CRA dates on the deadlines page, and subscribe to The CRA Brief.