← Back to CRA Insights
Conformity assessment

IEC 62443 and the Cyber Resilience Act: How Much of Your CRA Work Is Already Done?

Industrial and OT manufacturers often ask the same question about the Cyber Resilience Act (CRA): we already follow IEC 62443, so how much is left to do? The honest answer is "a lot of the engineering, little of the legal wrapper". The standard gives you a head start on how you build and maintain products. It does not replace the CRA's obligations on reporting, conformity assessment, CE marking and documentation.

Two different kinds of instrument

IEC 62443 is voluntary but widely used in critical infrastructure, while the CRA is binding and non-compliance can lead to fines or product bans in the EU per exida. The practical consequence is that your 62443 evidence is useful input to a CRA technical file, but it is not itself proof of conformity.

star Important

No CRA harmonised standard is cited in the Official Journal at the time of writing, so no standard, IEC 62443 included, currently gives you a presumption of conformity with the CRA. Treat 62443 as strong supporting evidence, not as a shortcut.

Where IEC 62443 helps

The exida analysis maps the main parts of the series onto CRA themes per exida:

  • IEC 62443-4-1 (secure product development lifecycle) relates to the CRA's secure-by-design expectations through threat modelling, secure coding and security testing before release.
  • IEC 62443-4-2 (component requirements) covers identification and authentication, software integrity and hardening, resilience and patch management, which relate to hardening a product before it reaches the market.
  • IEC 62443-3-2 (risk assessment) supports the risk-driven approach, including vulnerability management that does not disrupt industrial operations.
  • IEC 62443-2-4 (service provider requirements) relates to supply chain expectations such as SBOMs, supplier assessments and end-of-life support.
IEC 62443 partWhat it coversUseful for CRA topic
4-1Secure development lifecycleSecurity by design, testing, vulnerability handling process
4-2Technical component requirementsAuthentication, integrity, resilience, patching
3-2Security risk assessmentCybersecurity risk assessment input
2-4Service provider requirementsSupply chain and support practices

This mapping is a starting point drawn from one vendor's analysis. The authoritative test is the CRA's own essential requirements in Annex I, so confirm each mapping line by line against the regulation text and the Commission's implementation guidance before relying on it.

What IEC 62443 does not give you

The following points are our own analysis of where the CRA reaches beyond a typical 62443 programme. Check each against your own certificates and scope:

  • Reporting to authorities. Article 14 has applied since 11 September 2026 and requires an early warning within 24 hours and a notification within 72 hours for actively exploited vulnerabilities and severe incidents, submitted through the ENISA Single Reporting Platform.
  • EU declaration of conformity and CE marking. A 62443 certificate is not a substitute for the CRA conformity procedure that fits your product class.
  • A declared support period. The CRA expects you to state and honour a support period for security updates.
  • User information and documentation. Annex II information for users and the technical documentation file are CRA artefacts in their own right, with long retention.
  • Product scope versus system scope. Parts of 62443 address the system integrator and asset owner. The CRA puts the duty on the manufacturer of the product with digital elements placed on the EU market.

A practical gap-closing sequence

1
Inventory what you hold

List your 62443 certificates, assessments and audit reports with their scope: which products, which versions, which security levels.

2
Map to the CRA essential requirements

For each Annex I requirement, record which 62443 evidence supports it and where nothing exists.

3
Add the missing CRA processes

Stand up the Article 14 reporting workflow, the support period declaration, SBOM generation and the CRA-specific documentation.

4
Choose the conformity route

Confirm your product class and whether self-assessment is available or a notified body is needed. Plan early because notified body capacity is limited.

5
Re-run on each substantial change

Keep the mapping alive so a release does not silently invalidate your evidence.

Timing

The main CRA obligations apply from 11 December 2027, and reporting is already live. Industrial products often have long certification cycles, so the sensible move is to run the mapping now while your 62443 evidence is fresh.

help_outlineDoes IEC 62443 certification make my product CRA compliant?expand_more

No. It is voluntary and is not a harmonised standard under the CRA, so it does not by itself give a presumption of conformity. It can support your technical file.

help_outlineWhich part of IEC 62443 is most relevant for product makers?expand_more

Parts 4-1 and 4-2 are the most directly relevant, covering the development lifecycle and the technical requirements for components.

help_outlineDo I still need to report vulnerabilities if I follow 62443?expand_more

Yes. Article 14 reporting is a legal obligation that applies independently of any standard you follow.

help_outlineWill a harmonised standard change this?expand_more

Possibly. If harmonised standards are cited in the Official Journal, conforming to them would give a presumption of conformity for the covered requirements. Watch for developments.

Bottom line

If you already run a 62443-aligned development process, you are well placed on the engineering side of the CRA. Spend your effort on the parts the standard does not cover: reporting, conformity, declared support and documentation.