CRA Compliance Funding for SMEs: The SECURE Project's €11.5M Second Call, and the Timing Catch
CRA Compliance Funding for SMEs: The SECURE Project's €11.5M Second Call, and the Timing Catch
Small manufacturers often ask the same question about the Cyber Resilience Act: who pays for all of this? There is now a partial answer. The SECURE Project opened a second funding call on 1 October 2026 with a budget of €11.5 million for SMEs facing CRA compliance costs, according to an independent CRA guide. It also comes with a catch worth understanding before you spend time on an application.
This article relies on one independent guide for the call details. It is not an official EU publication. Read the official call text before you apply, and treat this as a briefing, not legal or grant advice.
The call at a glance
| Item | Detail |
|---|---|
| Opened | 1 October 2026 |
| Closes | 11 December 2026 |
| Budget | €11.5 million |
| Per SME | Up to €30,000 per project, 50% co-financing |
| Funding source | Digital Europe Programme, with the European Cybersecurity Competence Centre |
| Topic code | DIGITAL-ECCC-2024-DEPLOY-CYBER-06 |
The first call ran from 28 January to 29 March 2026 with €5 million, so the two calls together make up a €16.5 million pot. No third call has been announced.
Who can apply
Per the same guide, applicants must be a single legal entity that meets the EU SME definition and is incorporated in an EU or EEA country. You can submit only one proposal, and you cannot combine the grant with other EU funding for the same work.
What the money can cover
The listed eligible costs are practical ones: regulatory compliance work such as audits, certification support and policy drafting; product testing, including vulnerability assessment and penetration testing; security upgrades to production infrastructure; incident handling and supply chain security; and cybersecurity training. If you are unsure which of those your product needs, our guides on Annex I, Part II vulnerability handling and penetration testing under the CRA show where the obligations sit.
The timing catch
Here is the problem. The SECURE grant agreement was signed in November 2024 with an indicative duration of 36 months, which implies the programme winds down around November 2027. That is roughly a month before the CRA's main obligations apply on 11 December 2027, as the guide points out. Funded work would have to be finished in a narrow window after any award.
Results from the first call were not announced right away either, so expect a gap between submission and a signed grant. You generally cannot start funded spending until that grant is in place. What is not yet known is which SMEs will be funded and when projects can start.
A grant covers costs, not time. It does not change what the CRA requires, and Article 14 reporting duties have applied since 11 September 2026 whether or not you are funded.
A short applicant checklist
Check that you meet the EU SME definition and are incorporated in the EU or EEA as a single legal entity.
List the CRA tasks you need anyway, such as risk assessment, SBOM, testing and vulnerability handling, and match them to eligible cost categories.
Co-financing means you fund half. Confirm the budget before you commit.
Verify dates, eligibility and rules against the official call documents, not a summary.
Start the work that is on your critical path regardless. The 11 December 2027 date does not move.
For the wider picture of what small companies are entitled to, see our explainer on Article 33 relief for SMEs and the CRA compliance roadmap.
Frequently asked questions
How much can one SME receive?
Up to €30,000 per project, with 50% co-financing, according to the independent guide describing the call.
When does the second call close?
11 December 2026.
Can I combine this with other EU funding?
Not for the same work. The guide lists this as an eligibility condition.
Will a grant make me compliant?
No. It helps pay for compliance work. The obligations in Regulation (EU) 2024/2847 apply regardless.
Is a third call planned?
None has been announced so far.
Sources
Related reading

CRA Harmonised Standards Tracker: Category-by-Category Status, November 2026
No CRA harmonised standard is cited in the Official Journal yet. Here's where every EN 40000, ETSI EN 304 6xx, and OT standard stands - and what to do by product class right now.

What the European Refrigeration Attacks Demand of CRA-Ready Controller Manufacturers
The October-November 2026 European supermarket freezer attacks expose exactly the design failures the CRA's Annex I was written to prevent. Here's what they demand of manufacturers.
The New Product Liability Directive Treats Software as a Product: What It Means Next to the CRA
From 9 December 2026 the revised Product Liability Directive expressly covers software, including firmware and AI systems. It arrives a year before full CRA application. Here is how the two fit together, and which records protect you.