The CRA Supplier Questionnaire: What Buyers Are Asking and How to Answer Honestly

If you make industrial hardware, OT components, or connected devices, there is a good chance a customer or integrator has already sent you a cybersecurity questionnaire with "CRA" in the subject line. More are coming. The CRA's vulnerability-reporting obligations started on 11 September 2026, and full application follows on 11 December 2027. Buyers who integrate your components into their own products carry CRA obligations that depend partly on what you can demonstrate. Sending a questionnaire is how they document that they checked.
This post explains why those questionnaires are arriving, what the questions typically cover, and how to answer them accurately - including what you cannot yet claim while harmonised standards are still in draft.
Why questionnaires are arriving now
The CRA places the conformity obligation on the manufacturer who places a product on the EU market. When that manufacturer uses third-party components, Article 13(5) requires them to exercise due diligence over those components. A written questionnaire is the practical way to document that check: without dated records, there is no story to tell a market surveillance authority about how component-level risk was handled.
Questionnaires are a contractual due-diligence request, not a CRA legal requirement directed at you as a supplier. The regulation does not prescribe a questionnaire format or compel you to complete one. What it does is give your customer a reason to ask, and give you a reason to answer carefully. Overclaiming conformity or CE marking before it is legally possible creates its own risk.
A customer questionnaire is a contractual request, not a CRA legal obligation on the supplier. Do not claim CE marking or CRA conformity before your conformity assessment is complete and the Declaration of Conformity is signed. No CRA harmonised standard has yet been cited in the Official Journal, so the standards-based presumption of conformity under Article 27 is not yet available to anyone.
The questions buyers are asking - and what good answers look like
The table below groups the questions that appear most often in CRA-driven supplier questionnaires, drawn from published buyer guidance and OT-sector practice. For each question, it shows what a strong answer looks like and what evidence to attach.
| Theme | Typical question | What a good answer looks like | Evidence to attach |
|---|---|---|---|
| Secure development lifecycle | Do you follow a documented secure development lifecycle? Are you certified or assessed against IEC 62443-4-1? | Describe your SDL practices (threat modelling, secure coding, security testing, patch management). If you hold an IEC 62443-4-1 certificate, state the certifying body, scope, and expiry. If not certified, describe your maturity level honestly. | SDL policy document; IEC 62443-4-1 certificate or third-party assessment report; training records |
| Product security functions | Do your products meet IEC 62443-4-2 component security requirements? What Security Level do they target? | State which Security Level (SL 1–4) each product targets and how that was determined. Note that IEC 62443-4-2 is a useful reference but does not yet confer CRA presumption of conformity. | Product security specification; test reports; any third-party assessment against IEC 62443-4-2 |
| CRA product classification | How do your products map to CRA product categories (Default, Important Class I/II, Critical)? | Provide a product-by-product mapping to CRA Annexes III and IV. Reference the relevant draft vertical standard (e.g. prEN 50770 series for OT products) where applicable, noting it is still in draft. | Internal classification register; reference to Annex III/IV categories; draft standard references |
| Standards monitoring | Are you tracking the draft CRA harmonised standards relevant to your products? | Confirm which drafts you are monitoring (e.g. draft EN IEC 62443-4-1:2018/prAA:2026, prEN 40000-1-2, prEN 50770 verticals). Note that none is yet cited in the Official Journal and your compliance approach will be updated when they are. | Standards watch list; internal gap analysis against draft requirements |
| Vulnerability handling | Do you have a coordinated vulnerability disclosure policy? How do you handle vulnerability reports? | Provide the URL of your CVD policy and security contact. Describe your triage and remediation process, referencing ISO/IEC 30111 (handling) and ISO/IEC 29147 (disclosure) where you follow them. State your acknowledgment and response timelines. | CVD policy (URL or document); security.txt file; example advisory; response SLA commitments |
| Incident reporting | Can you notify customers of actively exploited vulnerabilities within the CRA timelines? | Describe your internal escalation process and customer notification runbook. The CRA requires a 24-hour early warning and 72-hour notification to ENISA for actively exploited vulnerabilities — confirm whether your process supports equivalent customer notification. | Incident response plan; customer notification template; contact escalation matrix |
| SBOM and component transparency | Can you provide a machine-readable SBOM for the components you supply? | State the format (SPDX or CycloneDX), the scope (top-level dependencies at minimum), and how frequently it is updated. Note that the SBOM need not be public but must be available to authorities and, contractually, to your customer. | Sample SBOM (redacted if needed); SBOM generation process description |
| Support period | What support period do you commit to for security updates? How do you communicate end-of-life? | State the support period per product line. The CRA floor is at least five years unless the product is expected to be used for less. Describe how security updates are delivered (free of charge, separately from feature updates where feasible) and how EOL is communicated. | Product support policy; EOL notification procedure; example security advisory |
| Technical documentation | Do you maintain technical documentation (design records, risk assessments, test results)? | Confirm that a technical file exists per product, covering the cybersecurity risk assessment, design records, test results, and vulnerability management evidence. You do not need to share the full file, but confirm it exists and is retained for the required period. | Technical file index (not the full file); retention policy statement |
How to answer honestly while standards are in draft
This is the part most supplier guidance skips. The standards situation is genuinely unsettled, and your answers need to reflect that.
As of 2 October 2026, no CRA harmonised standard has its reference published in the Official Journal of the EU. On 13 August 2026, ETSI opened the public enquiry on 17 vertical final draft CRA product standards. The EN 40000-1-1 and EN 40000-1-2 horizontal standards passed the CEN-CENELEC formal vote, with ratification as ENs scheduled for November 2026, but CEN-CENELEC does not expect either to be cited in the Official Journal in the near term. The proposed shift of delivery deadlines to 31 October 2026 (Type A/B) and 31 December 2026 (Type C) is still a draft amendment, not yet legally fixed.
For OT manufacturers, IEC 62443 remains the central practical reference today. The EN 50770 series will eventually provide the formal CRA harmonisation layer on top, but the gap between standard finalisation and the December 2027 enforcement date is roughly one year - which is tight for certification pipelines.
What this means for your questionnaire answers:
- Do not claim CRA conformity or CE marking unless your conformity assessment is complete and a Declaration of Conformity is signed. That is not yet possible for most products.
- Do reference IEC 62443-4-1 and 4-2 as the practical technical baseline you are working to, while noting they do not yet confer presumption of conformity under the CRA.
- Do flag which draft standards you are monitoring and confirm you will update your compliance position when they are cited in the Official Journal.
- Do be specific about gaps. A supplier who says "we are working toward IEC 62443-4-1 maturity level 2 and expect certification by Q3 2027" is more credible than one who claims full compliance with no evidence.
Organizations already following IEC 62443 are better prepared for the CRA, but the regulation introduces additional obligations in documentation, vulnerability notification, and timely update readiness that must be addressed before December 2027.
Use this tool to score your questionnaire readiness
Before you respond to a customer questionnaire, run through the self-assessment below to identify which areas need more work.
Evidence pack checklist
When you respond to a questionnaire, attach or reference the following. You do not need to share confidential design details - a structured index and policy documents are usually sufficient.
- SDL documentation: Secure development lifecycle policy; IEC 62443-4-1 certificate or gap assessment
- CVD policy: Public URL; security contact; example advisory
- SBOM: Sample (redacted if needed); format and generation cadence
- Product classification register: CRA Annex III/IV mapping per product line
- Support policy: Stated support period per product; EOL notification procedure
- Technical file index: Confirmation the file exists; retention period statement
- Incident notification runbook: Customer notification process; escalation contacts
- Standards watch list: Which drafts you are tracking; your update commitment
For more on technical documentation structure, see our Annex VII guide. For SBOM format options, see the SBOM starter guide.
Ready to map your gaps before the next questionnaire arrives?
If you are not sure which questions you can answer confidently today, a structured gap assessment against the CRA's Annex I requirements and the IEC 62443 baseline is the fastest way to find out.
FAQ
Is completing a customer CRA questionnaire a legal requirement under the CRA?
No. The CRA does not require suppliers to complete questionnaires. The obligation sits with the manufacturer who places the finished product on the EU market — they must exercise due diligence over their components under Article 13(5). A questionnaire is how they document that check. Completing it is a contractual matter between you and your customer, not a direct regulatory duty.
Can I claim CRA conformity or CE marking in my questionnaire response?
Only if your conformity assessment is complete and you have signed a Declaration of Conformity. For most products, that is not yet possible: no CRA harmonised standard has been cited in the Official Journal, so the standards-based presumption of conformity under Article 27 is unavailable. Claiming conformity before it is legally established creates its own liability. Instead, describe your current practices and your roadmap.
Does IEC 62443 certification satisfy CRA requirements?
IEC 62443-4-1 and IEC 62443-4-2 are the strongest practical technical references for OT and industrial component suppliers, and existing certification gives you a meaningful head start. However, in their current published form they do not confer CRA presumption of conformity — that requires the amended EN versions to be cited in the Official Journal, which has not happened yet. Reference your IEC 62443 status as evidence of your SDL maturity, not as CRA conformity.
What is the minimum a supplier should have in place before the December 2027 deadline?
At minimum: a documented secure development lifecycle, a coordinated vulnerability disclosure policy with a public security contact, a machine-readable SBOM per product, a defined support period, and a technical file per product including a cybersecurity risk assessment. The vulnerability-reporting obligations under Article 14 are already live as of 11 September 2026, so a customer notification process for actively exploited vulnerabilities should be in place now.
Related reading

CRA Harmonised Standards Tracker: Category-by-Category Status, November 2026
No CRA harmonised standard is cited in the Official Journal yet. Here's where every EN 40000, ETSI EN 304 6xx, and OT standard stands - and what to do by product class right now.

What the European Refrigeration Attacks Demand of CRA-Ready Controller Manufacturers
The October-November 2026 European supermarket freezer attacks expose exactly the design failures the CRA's Annex I was written to prevent. Here's what they demand of manufacturers.
The New Product Liability Directive Treats Software as a Product: What It Means Next to the CRA
From 9 December 2026 the revised Product Liability Directive expressly covers software, including firmware and AI systems. It arrives a year before full CRA application. Here is how the two fit together, and which records protect you.