← Back to CRA Insights
Scope

Cyber Resilience Act for HVAC/R and Building Automation: Which Connected Products Are In Scope?

If your company builds heat pumps, chillers, ventilation units, refrigeration controllers or building automation hardware, you probably think of yourself as a mechanical or energy business. The Cyber Resilience Act (CRA) sees it differently. Once a product has a network connection or remote data connection, it is a "product with digital elements", and the manufacturer carries cybersecurity duties for as long as the product is supported.

This guide explains how the CRA reaches HVAC/R and building automation, what changed in July 2026, and what to prioritise before the main obligations apply on 11 December 2027.

Which HVAC/R products are likely in scope

Industry coverage of the regulation lists the typical candidates: smart thermostats, connected heat pumps, refrigeration controllers, remote monitoring devices, building automation and control systems (BACS), ventilation controllers and IoT gateways, with the caveat that coverage depends on each product's characteristics, intended use and any legislative exclusions per Refindustry.

A practical way to start is to sort your portfolio into three groups:

  • Clearly connected: products that ship with Wi-Fi, Ethernet, cellular, or a fieldbus gateway and are reachable from a network or cloud service.
  • Connected through an accessory: a plain controller that becomes connected when an installer adds a gateway or a service dongle. Check who places which part on the market, because the gateway itself may be the in-scope product.
  • Not connected: purely local devices with no data interface. These are generally outside the CRA's product scope, but verify rather than assume, including service ports and update interfaces.
info Note

Scope is decided product by product, not company by company. A mixed portfolio of legacy mechanical units and new connected units will usually need a documented scoping decision for each product line.

What the July 2026 guidance changed

The European Commission published implementation guidance on the CRA on 27 July 2026. It covers products with digital elements across hardware and software, elaborates on risk assessment, secure-by-design and secure-by-default principles, vulnerability handling and security updates, and addresses overlaps with NIS2 and the AI Act per Pearl Cohen. Eurovent reported on 29 July 2026 that the guidance gives greater certainty to HVACR manufacturers, although its full commentary sits behind a members-only wall per Eurovent.

Separately, EVIA and other stakeholders issued guidance for Technical Building Systems and BACS manufacturers in July 2026 per Refindustry. We have not been able to review the member-only documents, so check them through your trade association before you rely on any detail from them.

The dates that matter

Three dates frame the work:

  • 11 June 2026: the provisions on notified conformity assessment bodies began to apply.
  • 11 September 2026: vulnerability and incident reporting under Article 14 became mandatory, including for products already on the EU market.
  • 11 December 2027: the main cybersecurity obligations apply to products placed on the EU market.

The reporting date is the one many equipment makers underestimated. If a connected unit installed years ago has an actively exploited vulnerability, the 24-hour early warning clock applies now, not in 2027. Our posts on the Single Reporting Platform and on registering before you need it cover the mechanics.

Why HVAC/R is a hard case

Building equipment differs from consumer electronics in ways that shape your CRA plan.

Long lifetimes. A heat pump or chiller can stay in service for well over a decade. The CRA requires security updates for the support period you declare, and the support period must reflect how long users can reasonably expect to use the product. Plan the declared period against real service life, not against the lifespan of the chipset vendor's SDK.

Updates reach the installed base slowly. Many units sit behind a building network, a gateway, or an installer's service contract. Decide how security updates get delivered when no end user is logged in: automatic, via the installer, or through a service portal. Whatever you choose, document it.

Several parties touch one system. A controller maker, a gateway vendor, a cloud platform provider and an installer may all be involved. Be explicit about who is the manufacturer of each in-scope product and who answers to authorities.

Third-party components dominate. Most of the firmware in a connected controller is a vendor SDK, an RTOS or embedded Linux. Your duty of due diligence on those components, and your software bill of materials, are the starting point for knowing what you ship. Both are covered in our earlier posts on third-party components and SBOM requirements.

A sensible order of work

1
Scope the portfolio

List every product line with a network, wireless or cloud interface, including gateways and accessories, and record an in-scope or out-of-scope decision with reasons.

2
Name the owner of vulnerability handling

Assign a person or team to receive reports, run the 24-hour and 72-hour clocks, and register on the ENISA Single Reporting Platform.

3
Build an SBOM per product

Generate machine-readable bills of materials from your firmware builds and keep them current with each release.

4
Decide the support period and update path

Set the declared support period per product, and define how fixes reach installed units that nobody actively manages.

5
Close the gaps in your risk assessment and technical file

Document threats, mitigations and test evidence in line with the essential requirements, and decide the conformity route for each product class.

What we do not know yet

No CRA harmonised standard has been cited in the Official Journal at the time of writing, so there is no presumption-of-conformity shortcut for the main requirements. Plan for self-assessment where your product class allows it, and verify the class of any building-control product that performs a security-relevant function.

help_outlineIs a smart thermostat covered by the CRA?expand_more

A thermostat that connects to a network or to remote data processing is a product with digital elements and is likely in scope. Confirm against the product's intended use and the Commission guidance.

help_outlineDo I have to report vulnerabilities in units already installed?expand_more

Yes. Article 14 reporting obligations have applied since 11 September 2026 and can cover products already on the EU market.

help_outlineCan my gateway supplier handle CRA compliance for me?expand_more

Only for the products they place on the market as manufacturer. If you put your name on the system, you may be the manufacturer of the whole product.

help_outlineWhen do the main requirements apply?expand_more

The main cybersecurity obligations apply from 11 December 2027.

Bottom line

For HVAC/R and building automation makers, the CRA is less about adding a security feature and more about running a security process for the whole life of a long-lived product. Start with the scoping decision and the vulnerability-handling owner, because those are the pieces that already bite today.